{"id":51,"date":"2016-03-03T15:22:20","date_gmt":"2016-03-03T15:22:20","guid":{"rendered":"http:\/\/127.0.0.1\/webdev\/ptshvlv\/?page_id=51"},"modified":"2016-03-19T17:41:25","modified_gmt":"2016-03-19T17:41:25","slug":"light-weight-tapping","status":"publish","type":"page","link":"https:\/\/powerpipelinetechnology.com\/index.php\/field-services\/light-weight-tapping\/","title":{"rendered":"Light Weight Tapping"},"content":{"rendered":"<h1>Light Weight  Tapping Machines <\/h1>\n<div class=\"row\"> <div class=\"col-md-8  \">><strong>35 bar light weight tapping machine set-up complete with hydraulic motor, from the left hand side the kit has the following cutter adaptors class Pn16\/CL150, sizes 3&rdquo;-4&rdquo;-6&rdquo;-8&rdquo;. Far right hand side the kit has the main drilling machine complete with hydraulic motor, drilling shaft and feed screw. <\/strong><\/p>\n<p><strong>Centre of the picture, centre right and front shows the 3&rdquo;-4&rdquo;-6&rdquo;-8&rdquo; standard cutters, 3&rdquo;-4&rdquo;-6&rdquo;-8&rdquo; pilot drills, front centre drilling shaft. Two number drilling shafts only required to complete cutting from 3&rdquo;-8&rdquo; diameter the hydraulic power unit on the right.<\/strong><\/p>\n<\/div>\n<div class=\"col-md-4  \"> <\/p>\n<p><img src=\"http:\/\/powertechnologyservices.co.uk\/images\/light%2001.jpg\" alt=\"Light weight tapping\" ><\/p>\n<\/div>\n<\/div>\n<div class=\"row\"> <div class=\"col-md-8  \"> <strong>Adaptors, cutters and pilots for the 35 bar light weight tapping machine 3&quot;-8&quot; the kit has the following from rear left to right 3&quot;-4&quot;-6&quot;-8&quot; cutting adaptors, from front to centre 3&quot;-4&quot;-6&quot;-8&quot;. Standard cutters and pilot drills, 3&rdquo;-4&rdquo;-6&rdquo;-8&rdquo;. <\/strong><\/p>\n<p><strong>Note: Sizes 10&quot; and 12&quot; are available as add on, contact the factory for prices.<\/strong><\/p>\n<\/div>\n<div class=\"col-md-4  \"> <\/p>\n<p><img src=\"http:\/\/powertechnologyservices.co.uk\/images\/light%2002.jpg\" alt=\"tank tapping 2\"><\/p>\n<\/div>\n<\/div>\n<div class=\"row\"> <div class=\"col-md-8  \"> <strong>Pilot drills for the 35 bar light weight tapping machine 3&quot;-8&quot; the kit has the following from left to right 3&quot; pilot drill, 4&quot; pilot drill. 6&quot; pilot drill, 8&quot; pilot drill which fits into the drilling shafts, all drills are tipped with HSS tips or carbide if requested.<\/strong><\/div>\n<div class=\"col-md-4  \"> <\/p>\n<p><img src=\"http:\/\/powertechnologyservices.co.uk\/images\/light%2003.jpg\" alt=\"tank tapping 3\" ><\/p>\n<\/div>\n<\/div>\n<div class=\"row\"> <div class=\"col-md-8  \"><strong>35 bar light weight tapping machine break down complete set 3&quot;-8&quot; diameter from rear left to right the kit shows the cutter adaptors class Pn16\/CL150, sizes 3&quot;-4&quot;-6&quot;-8&quot;, plus cutters and pilot drills.<br \/>\n Centre from left to right the light weight tapping machine complete with feed screw and hydraulic motor. Front centre drilling shaft. Two number drilling shafts only required to complete cutting from 3&quot;-8&quot; diameter.<\/strong><\/div>\n<div class=\"col-md-4  \"> <\/p>\n<p><img src=\"http:\/\/powertechnologyservices.co.uk\/images\/light%2004.jpg\" alt=\"tank tapping 4\" ><\/p>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Light Weight Tapping Machines<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":20,"menu_order":5,"comment_status":"closed","ping_status":"closed","template":"page-fullwidth.php","meta":[],"_links":{"self":[{"href":"https:\/\/powerpipelinetechnology.com\/index.php\/wp-json\/wp\/v2\/pages\/51"}],"collection":[{"href":"https:\/\/powerpipelinetechnology.com\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/powerpipelinetechnology.com\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/powerpipelinetechnology.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/powerpipelinetechnology.com\/index.php\/wp-json\/wp\/v2\/comments?post=51"}],"version-history":[{"count":8,"href":"https:\/\/powerpipelinetechnology.com\/index.php\/wp-json\/wp\/v2\/pages\/51\/revisions"}],"predecessor-version":[{"id":314,"href":"https:\/\/powerpipelinetechnology.com\/index.php\/wp-json\/wp\/v2\/pages\/51\/revisions\/314"}],"up":[{"embeddable":true,"href":"https:\/\/powerpipelinetechnology.com\/index.php\/wp-json\/wp\/v2\/pages\/20"}],"wp:attachment":[{"href":"https:\/\/powerpipelinetechnology.com\/index.php\/wp-json\/wp\/v2\/media?parent=51"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}